You’ve Received a Party Wall Notice: What Now?
You've Received a Party Wall Notice: What Now?
A notice means your neighbour is proposing work that may affect your property under the Party Wall Act. You do not have to sign before you understand the proposal. Check what the notice covers, note the response date and ask about anything unclear. We explain your options, including choosing a surveyor, so you can respond with a proper understanding of the work and the protections available.
The building owner normally pays reasonable surveyor fees for their improvement works. The particular scope and cost arrangements need checking before appointment.
- Your options explained
- Impartial statutory role
- Fees clarified before appointment
- Pre-works condition record
What the notice actually means
A party wall notice tells you about proposed works covered by the Party Wall etc. Act 1996. As an adjoining owner, you have rights concerning your response, relevant surveyor appointments and protection from qualifying loss or damage. Receiving a notice does not mean you have already agreed to the work.
First, check the property, proposed works, drawings and notice type. Existing party structure work, a boundary wall and excavation follow different provisions. Planning permission is separate, so a planning approval does not remove your party wall rights.
The building owner normally pays reasonable party wall costs for their improvement works. Check the appointment terms so you understand what is included and any circumstances in which you could be charged. Our roles overview explains how the owners and surveyors fit into the process.
Simple Transparent Pricing
Fixed fees for extensions, loft conversions, basements & new builds
Your three options: consent, dissent, or do nothing
| Your response | What it can mean |
|---|---|
| Consent in writing | An award may be unnecessary. The Act’s applicable duties still continue. |
| Dissent | The relevant dispute can be settled through the statutory surveyor process. You can agree on one surveyor or appoint your own. |
| Do not respond | For party structure and section 6 notices, fourteen days without written consent creates a deemed dispute. Section 1 boundary wall notices are different. |
The fourteen-day response period is not the date on which all work can automatically begin. Notice periods, any dispute and particular consent requirements also matter.
Read the proposal before choosing. Ask for an explanation if the drawings do not show enough to understand the work. Ignoring the notice does not make it disappear or guarantee that the process will wait indefinitely for you.
What happens if you do not reply
For party structure and section 6 notices, the Act provides a way forward when written consent has not been received within fourteen days. That creates a deemed dispute without requiring either neighbour to start an argument.
It does not immediately appoint a surveyor for you. Section 10 has a further procedure where an owner refuses to appoint or neglects to do so after the relevant written request, including a ten-day period for neglect. Responding yourself gives you a clearer opportunity to understand the proposal and make your own appointment choice.
Section 1 follows different rules. In particular, your lack of consent does not authorise a new wall astride the boundary. Have the actual notice checked rather than rely on a general statement about silence.
Your right to appoint your own surveyor
Where the statutory dispute process applies, you can appoint your own surveyor. You do not have to accept the building owner’s suggested surveyor simply because their name appears on a response form.
Alternatively, both owners can appoint one agreed surveyor. That surveyor must act impartially, just as separately appointed surveyors must. Consider the proposal, relevant experience and your confidence in the arrangement before making a written appointment.
Statutory appointments cannot ordinarily be withdrawn by the owners. Ask what you are signing and tell a prospective surveyor about any appointment already made.
Who pays for your surveyor
The building owner normally pays reasonable surveyor costs arising from their improvement works. The appointed surveyor or surveyors determine the allocation under the Act. Separate advice or additional instructions can have different fee arrangements, so ask for those to be explained before committing.
Ask about the fee basis, proposed scope and any circumstances in which you could be charged. Unnecessary work, separate advice outside the statutory appointment and disputed costs may need particular attention.
What the schedule of condition does for you
A schedule of condition records relevant visible parts of your property before the works. Dated photographs and written observations provide a reference if a crack appears or an existing defect seems to worsen.
Show the surveyor areas you are concerned about and ask what the inspection covers. Retain the record and report apparent omissions promptly. It helps assess later damage; it is not insurance or proof of the cause of every change.
Can you stop the works?
The Act does not generally give you a veto over properly authorised covered works. Dissent normally leads to the surveyor process, rather than a permanent refusal of the project.
There are important limits to the building owner’s rights. A new wall astride the boundary and special foundations on your land involve particular written consent requirements. Legal remedies may also be available where the law is not followed. Seek independent legal advice about threatened or ongoing unlawful work rather than assume either that you can stop everything or that you have no rights.
What you can and cannot object to
| Matters for assessment under the Act | Matters needing a separate route or advice |
|---|---|
| Relevant construction methods and protective arrangements. | Planning objections about design, appearance or loss of privacy. |
| Statutory access and conditions for covered work. | Disputed ownership or the legal position of a boundary. |
| Qualifying damage, compensation and reasonable party wall costs. | Broader neighbour disputes unrelated to covered works. |
Explain your concern to the surveyor, who can identify where another professional is needed. Security for expenses may also be relevant under section 12 in particular circumstances; it is not an automatic guaranteed payment for every adjoining owner.
If damage happens to your property
Record what you can see with dated photographs and contact the building owner and appointed surveyor promptly. Note when the change appeared and what work was taking place.
The condition record and current evidence can then be compared, with inspection or technical input where needed. Repairs or compensation depend on the applicable duties and findings, rather than on a promise that every defect will be paid for automatically.
Immediate safety concerns need urgent professional assistance. For an unresolved statutory issue, read about party wall dispute resolution.
Frequently Asked Questions
I've received a party wall notice: what should I do?
Read the proposal, identify the notice type and note the response date. You can consent or dissent; silence has particular consequences for party structure and excavation notices. Ask questions before signing if the work is unclear.
Do I have to pay for a party wall surveyor?
The building owner normally pays reasonable costs for their improvement works. That is not a guarantee covering every circumstance or extra instruction. Check the fee arrangements before appointing anyone.
What happens if I ignore the notice?
Party structure and section 6 notices produce a deemed dispute after fourteen days without written consent. Appointment on your behalf requires further statutory steps. Section 1 has different rules, so check which notice you received.
Can I stop my neighbour’s building work?
You do not generally have a veto over covered works lawfully carried out. Particular consent requirements and legal remedies still matter. Get advice on the actual proposal rather than assume dissent stops the entire project.
Should I consent or dissent?
Your response should reflect the work proposed and any concerns that remain. Consent may suit a proposal you understand and accept; dissent enables the statutory award process. Ask for an explanation of unclear drawings or arrangements before deciding, and take advice if needed.
What protects my property?
The Act provides rights and duties, and an award can set conditions for disputed matters. A condition record supplies useful pre-works evidence. Together, these provide a basis for checking the work and addressing concerns if damage is reported.
What if my property is damaged?
Report the change promptly, keep dated evidence and involve the appointed surveyor where appropriate. The cause and remedy need assessment. Urgent structural concerns require immediate professional attention rather than waiting for the paperwork process.
Can I choose my own surveyor?
Yes, where a statutory appointment is required you can choose a separate surveyor rather than agree to the neighbour’s suggestion. Reasonable fee allocation and any existing appointment should be checked before you sign.
Appoint us as your surveyor
Send the notice, drawings and any response you have already made. We will explain the proposed role and cost arrangements before you decide on an appointment.
- Your choice of appointment
- Impartial statutory role
- Fees explained upfront
- Pre-works condition record