An existing crack is much easier to discuss when there is a clear record of it. Our schedule of condition combines dated photographs with written observations before the relevant building work begins. It gives both neighbours a shared reference if something changes, so a later conversation about damage can start with evidence rather than two different memories of the same wall.

Standalone schedules from £350. No VAT. A schedule is also included in our award service, from £700.

What a schedule of condition is

A schedule of condition is a dated written and photographic record of a property’s visible condition at the time of inspection. For party wall work, it usually covers relevant accessible parts of the adjoining property before construction starts. A standalone schedule of condition survey starts from £350, with no VAT.

The purpose is to record what is already there. Existing cracks, damaged finishes and other visible defects can then be considered alongside any changes reported during the works.

The inspection records visible condition; it does not investigate hidden defects or replace a full structural survey. If damage is reported later, the record can be compared with the current condition alongside any further evidence needed to establish the cause.

Simple Transparent Pricing

Party Wall Notice

Free

Professional preparation and service

Schedule of Condition

from £350

Comprehensive photographic report

Party Wall Award

from £700

Complete legal agreement

Fixed fees for extensions, loft conversions, basements & new builds

What we photograph and record

The inspection should follow the areas that could reasonably be affected by the proposed work. For an extension, that might include adjoining rooms and relevant external walls; a basement proposal can call for a different scope.

  • Walls and ceilings are recorded, including visible cracks and their locations.
  • Floors and relevant finishes are described where accessible.
  • Existing decorative damage, staining and other visible defects are noted.
  • Relevant external elevations and features are included where access allows.
  • Photographs are linked to locations and written observations so that they can be understood later.

A photograph alone can be difficult to interpret if nobody knows which room or wall it shows. The written description gives it context. Equally, a report should be clear about areas that were inaccessible, concealed or outside the inspection scope; an unrecorded area should not be presented as defect-free.

Ask what the inspection includes, particularly in an occupied home with furniture, stored belongings and restricted access.

When it is carried out

The useful time for a pre-works condition survey is before the relevant construction, excavation or demolition begins. Arrange access early enough for the surveyor to inspect and complete the record before the contractor reaches that stage.

An inspection after work has started can still record the condition on that date, but it cannot recreate an independent record of how the property looked beforehand. Tell us immediately if the works are already under way so that the report’s limitations can be made clear.

Why it protects the building owner

A building owner needs a fair way to assess a reported change. If a crack was visible before construction, a dated photograph and description can help establish that fact without dismissing the neighbour’s concern.

A pre-existing crack may worsen during building work, so its earlier appearance is only part of the evidence. The surveyor also considers the change itself, the work undertaken and any areas outside the original inspection. This gives both owners a fairer basis for assessing the concern.

Why it protects the adjoining owner

The adjoining owner gains a record that can help support a genuine concern if damage appears. That is particularly useful where the same room looks different several months into a noisy or disruptive building project.

Point out existing defects and areas of concern during the inspection. Keep your copy and raise questions about any missing locations promptly. Both owners can then refer to the same dated record if the condition of a room or wall changes.

Read more about adjoining owner rights.

What happens if damage occurs

  1. Record the change with dated photographs and tell the building owner and appointed surveyor promptly.
  2. The current condition is compared with the schedule, alongside the timing and nature of the works.
  3. Further inspection or technical evidence may be needed to understand the cause and extent of the damage.
  4. The applicable making-good or compensation arrangements are considered, using the statutory dispute process where appropriate.

The schedule helps with that assessment; it does not replace it. If there is an immediate safety concern, obtain urgent assistance from an appropriately qualified professional rather than wait for a routine comparison of photographs.

Get help with a damage dispute.

Access: what we need from your neighbour

We need an agreed appointment and access to the relevant areas. Explain the purpose of the inspection, who will attend and what is likely to be photographed. Photographs should focus on the property’s condition, with care around personal belongings and privacy.

If access is refused, the position needs checking rather than assuming either that entry is always available or that no record can be made. Section 8 provides defined entry rights for surveyors appointed or selected under section 10, subject to its purposes and notice requirements. A routine request for a standalone survey is not itself an unrestricted right to enter someone’s home.

Is it optional?

The Act does not make a schedule of condition compulsory in every case. It is nevertheless a useful precaution and is commonly included with a party wall award, whose particular conditions should be checked.

Written consent to the works does not make a condition record pointless. Both neighbours may still want evidence of the starting condition. If you are proceeding without an award, agree the inspection arrangements and who receives the record before construction begins.

What it costs

Our standalone schedule of condition price starts from £350, with no VAT. The award service, from £700, also includes a schedule of condition. Your quote should make clear which arrangement applies so that you do not budget for the same service twice.

Send the property address, drawings and any known access restrictions. We can then confirm the areas to be inspected, the reporting arrangements and the fee before you book.

Frequently Asked Questions

A schedule of condition is a dated record of visible property condition, supported by photographs and written descriptions. It provides evidence for comparison if a change or damage is reported later.

The relevant accessible areas can include walls, ceilings, floors, existing cracks, finishes and external features near the works. The proposal and agreed scope determine what is covered.

Not in every case under the Act. It may form part of the arrangements required by an award, and it remains useful where both owners consent to work without an award.

A standalone record starts from £350, with no VAT. Our award service includes a schedule. Check the pricing and your written quote for the scope that applies.

Tell the surveyor before the inspection date. Access rights depend on the appointment, purpose and statutory conditions; they should not be assumed from a general booking request. Any inspection limitations must be recorded.

Report it promptly and keep dated evidence. The schedule is compared with the current condition, with further investigation where needed. Unresolved matters may require dispute resolution.

The duration depends on the areas, layout, access and defects needing a record. We can give an estimate once the scope is known, rather than promise every home can be inspected in the same time.

Both owners should have access to the completed record for the agreed scope. Where it accompanies an award, retain it with the award and drawings. Confirm reporting and distribution arrangements when booking.